Optus Late Join - eJV Upgrade – Tech and Rigging Project

  • Internal shelter PSU upgrade for TPG to the latest lithium ion 48v DC power system.
  • Removal of all Huawei equipment as well as legacy power cabling not up to new standards.
  • Installation of new BTS racks, HFDCDU, fibre management, patch panels and Nokia BTS equipment.
  • External steelwork swap for both Optus and TPG.
  • Full swap TPG Huawei equipment out for Nokia RRH and 5G AAU. This was another challenging inner-city rooftop that we ensured was delivered safely by the implementation of safety scaffolding. This prevented 3rd party damage and injury while keeping the tenants parking access available as stipulated by the building management.